TELEPHONE
NETWORK REHABILITATION - OSP2 (PHASES I, II & III)
Location: Mount
Lebanon
Employer:
Ministry of Telecommunications
Consultant and Supervisor:
Dar Al - Handasah
PROJECT PARTICULARS:
- Direct contract with the Ministry of Telecommunications
- Average monthly trenching production 15 km
- Peak monthly trenching production 20 km
- FIDIC contract conditions
A combination of underground and arial telephone network
distribution
in the Chouf and Mount Lebanon areas.
Total trenching 500kms including all cabling from the Exchange
to the
Subscriber box, PVC ducts, manholes, trenches, asphalting,
cabling,
jointing terminations.
The total number of primary pairs installed is 80,000 delivered
operational within a period of 36 months.
PUBLIC
SWITCHED TELEPHONE NETWORK-PSTN (Mount Lebanon & Bekaa)
Location:
Mount-Lebanon and Bekaa
Employer: Telefonaktiebolaget
LM ERICSSON of Sweden
Consultant: Dar
Al-Handasah - Shair & Partners
PROJECT PARTICULARS:
- Subcontract from ERICSSON of Sweden;
- Average monthly trenching production 15 km;
- Peak monthly trenching production 32 km;
- FIDIC contract conditions.
All Civil Works including: Trenches, PVC and concrete ducts,
construction and installation of concrete manholes, testing,
backfilling, asphalting.
445 kms Total of underground trenches have been executed together
with the installation of 4149 Precast units, Man-hours spent
reached 2,000,000.
 |
TELEPHONE EXCHANGE BUILDINGS
Location:
Mount-Lebanon and Bekaa
Employer:
Telefonaktiebolaget LM ERICSSON of Sweden
Engineer:
Dar Al-Handasah - Shair & Partners
The project included the construction of five E-MOD
type building exchange, one E15K and one E30K, with
execution of all infrastructure, civil and architectural
activities as well as the Erection of the microwave
Antenna towers.
|
|
 |